Rated 5.0 on Google

Solar in Eastleigh

Six panels fully installed from £6,000, or £7,800 with a 6kWh battery. Scaffolding and 0% VAT included, and a free survey fixes your price in writing.

safia segouini
Would definitely recommend to anyone considering solar. Really happy with the service from Pro Fit. The whole process was smooth from start to finish, and the team were friendly, professional and kept me informed throughout. The solar panels look great and everything was installed neatly and efficiently.

Google review, October 2026Solar

Get your guide price

What type of property is it?

What are you looking for?

Rated 5.0on Google
MCScertified, NAP/83770/26/1
Free surveyno obligation
Fixed pricein writing after survey
0% VATends 31 March 2027

Areas we cover

In and around Eastleigh.

The same published prices apply everywhere in Eastleigh, and the survey is free. We cover Eastleigh from our office in Poole.

  • Chandler's Ford
  • Hiltingbury
  • Hedge End
  • Bishopstoke
  • Fair Oak
  • Horton Heath
  • Allbrook
  • Botley
  • West End
  • Bursledon
  • Hamble-le-Rice
  • Netley

At a glance

What decides a solar job in Eastleigh.

  • PlanningEastleigh Borough Council, with Hampshire County Council above it
  • Homes15,340 detached houses, and 8,860 built from 1973 to 1982
  • Grid operatorSSEN, checked by postcode across SO50, SO53, SO30 and SO31
  • ConservationEight areas, including Bishopstoke, Botley and Hamble

Guide prices in Eastleigh

Fully installed with DMEGC 465W all-black panels, a battery-ready hybrid inverter, scaffolding and 0% VAT. The same table applies everywhere we work, and your survey fixes the price in writing.

Guide prices by number of panels and battery option, fully installed with scaffolding and 0% VAT
SystemOutputSolar only+ 6kWh battery+ 12kWh battery
6 panels2.79 kWp£6,000£7,800£9,500
8 panels3.72 kWp£6,400£8,200£9,900
10 panels4.65 kWp£6,800£8,500£10,100
12 panels5.58 kWp£7,200£8,900£10,500

0% VAT on qualifying installations until 31 March 2027, then 5%. What qualifies, or see every price and what can change it.

Call 01202 161222

Every installation

What every price includes

  • DMEGC 465W all-black panels
  • Hybrid inverter, battery-ready from day one
  • Battery where selected, set up for off-peak charging
  • Scaffolding, put up and taken down
  • Bird protection around the panels
  • Monitoring app, set up before we leave
  • Grid connection paperwork and handover pack
  • Help registering for export payments

Batteries and inverters from Fox ESS, Tesla, Sigenergy, Sunsynk and Powervault, named on your written quote. Backup through a power cut, for key circuits or the whole home, is priced at survey.

A Pro-Fit installer in a branded hard hat, hi-vis and work gloves stepping across a finished all-black solar array, one hand on a panel
Installed by Pro-Fit

What customers say about Pro-Fit.

Reviews
5.0
See our reviews on Google
  • Sam HoltonGoogle review, October 2026
    Layout of the panels are spot on, the team put in graft the last 2 days, big job done properly and smoothly! Excited to see the returns from this install!
    Solar
  • Keeley ShawGoogle review, October 2026
    Recently had 8 panels installed and Henry & theo were really polite and professional. From start to finish everything was great and no mess was made or left behind. Excellent - ⭐️⭐️⭐️⭐️⭐️
    Solar
  • jakGoogle review, September 2026
    Used them for panels and a battery. Fraser and Theo were professional from start to finish. Would definitely recommend. The design and layout were perfect.
    Solar and battery
  • Elias MugotGoogle review, September 2026
    Really appreciated the team didn’t try to upsell me. Connor was able to help looking at our usage, roof angle and shading and design a good design that actually made sense for us going forward.
    Solar design
  • BenGoogle review, September 2026
    Great work, the team arrived on time and have worked relentlessly to get the panels installed, was a 8 panel install and it looks superb, im pleased as they dont look ugly and actually compliment our new slate roof.
    Solar
  • Max WareGoogle review, September 2026
    Fraser installed 6 panels and the system is now up and running too. We cant wait to see the returns and we are so glad we've taken the step earlier rather than later. Thank you!
    Solar
  • AhmadGoogle review, September 2026
    Aaron has been a pleasure, the office when calling in were also super polite. Will definitely be using for future solar jobs on our other commercial properties.
    Commercial solar

How it works

  1. A guide price, or a call

    Answer five short questions for a guide price on screen, or ring us. We design a system around your roof and how you use electricity.

  2. Free home survey

    A surveyor checks your roof, loft, electrics and access. Your price is then fixed in writing, and you have 14 days to change your mind.

  3. Installation

    Usually one to two days on site, with scaffolding included in the price. We commission the system and notify the grid operator for you.

The local detail

What changes a solar job in Eastleigh.

We fit solar panels and batteries across Eastleigh, Chandler's Ford, Hedge End and Bishopstoke, with guide prices from £6,000 for 6 panels. Detached houses are the borough's largest group and 1973 to 1982 its busiest building period, so the roof, where a battery goes and SSEN's paperwork are the usual questions here. Our Hampshire page covers the wider county, and a free survey answers them for your address.

How old are the houses in Eastleigh, and what does that mean for the roof?

The Valuation Office Agency's table for Eastleigh borough counts 8,860 homes built between 1973 and 1982, its largest single period, followed by 6,960 from 1983 to 1992 and 6,590 from 1955 to 1964. Only 2,280 were built before 1900. By type, detached houses lead with 15,340, ahead of 14,160 semis, 14,060 terraced houses and 10,500 flats and maisonettes, out of 61,320 homes at 31 March 2025 (Valuation Office Agency, Tables CTSOP3.0 and CTSOP4.0).

The oldest streets belong to the railway town. The London and South Western Railway moved its carriage and wagon works to Eastleigh from Nine Elms in 1891 and its locomotive works in 1909, and the town centre was laid out on a Victorian grid2. Chandler's Ford grew in stages, from 1920s building in King's Court, Merdon and Hiltingbury to later estates around Scantabout, Peverells Road, Spring Hill and Oakmount3. Hedge End grew from an estimated 1,000 people in the 1950s to about 17,978 in 2001, with Grange Park its most recent large addition4.

For the panels, a 1970s or 1980s estate house usually has a simple pitched roof in concrete interlocking tiles, which takes standard roof hooks. What limits the array is more often a hipped end that shortens the slope, the way the roof faces, or a garage or extension roof that could carry extra panels. On a Victorian terrace near the railway, slate and a narrower slope need more care, and we check the battens and covering before anything is fixed.

Who decides planning in Eastleigh, Chandler's Ford and Hedge End?

Eastleigh Borough Council is the planning authority, with Hampshire County Council above it as the county tier. Below the borough sit parish and town councils: Bishopstoke Parish Council, Chandler's Ford Parish Council and Hedge End Town Council, renamed when the village took town status in 1992, while the town of Eastleigh itself became a civil parish on 1 April 20215. Planning applications are decided by the borough.

For most houses no application is needed. Roof panels are permitted development within national limits, no more than 0.2 metres proud of the slope and no higher than the ridge, as our guide to planning permission for solar panels explains. A listed house is the exception: it cannot use permitted development for solar at all (legislation.gov.uk, Part 14).

Are there conservation areas around Eastleigh?

Eight across the borough, and none of them is named for Eastleigh town centre, Chandler's Ford or Hedge End. The council's data lists Hamble (1969), Botley (1975), Bishopstoke (1977), Netley Abbey (1981), Old Bursledon (1983), Gaters Mill and Romill Close at West End (1989), Bursledon Windmill (1990) and Orchards Way, West End (1999) (planning.data.gov.uk). The same register lists no article 4 directions from Eastleigh. That is a reading of the lists rather than a map, so we still check your address against the boundaries before quoting.

Inside a conservation area the national limits tighten only a little: panels cannot go on a wall, balcony or roof enclosure that fronts a highway, and a flat roof needs the council's prior approval first. The two nearest the town are Bishopstoke, the old village about a mile east of Eastleigh town centre on the River Itchen5, and Botley, which adjoins Hedge End4. Everywhere, the panels must be sited, so far as practicable, to keep their effect on the building's appearance down.

Which grid operator covers Eastleigh, and when does SSEN have to agree first?

SSEN, through Southern Electric Power Distribution6. We checked postcodes across the borough: SO50 for Eastleigh and Bishopstoke, SO53 for Chandler's Ford and Hiltingbury, SO30 for Hedge End and Botley, and SO31 for Bursledon and Hamble. Every one falls well inside SSEN's southern licence area on the boundary map published by NESO, the National Energy System Operator. SSEN's own plan for its Nursling grid supply point names Eastleigh among the council areas it supplies, with substations at Eastleigh, Eastleigh North, Bishopstoke and Hedge End (SSEN, February 2026).

In practice, up to 3.68kW per phase, SSEN's guidance has the installer tell it once the system is running. Go above that, with a bigger array or a battery inverter that adds to the total, and SSEN agrees the connection before it is switched on. Either way we make the submission, and the documents are in your handover pack.

Where does a battery go in a Chandler's Ford or Hedge End house?

Usually in the garage, a utility room or a cupboard near the consumer unit, and the survey settles which. A detached or semi-detached house tends to offer more choice than a flat or a mid-terrace. Every price includes a hybrid inverter, battery-ready from day one, so a battery can follow later. It is still worth deciding at survey, because a battery can take the system over SSEN's 3.68kW threshold and change what we submit. Our battery storage page sets out the options, and if you already have panels, our guide to adding a battery to existing solar panels covers what we check first.

Sources for this page (12)
  1. Valuation Office Agency, "Council Tax: stock of properties, 2025" (Tables CTSOP3.0 and CTSOP4.0), https://www.gov.uk/government/statistics/council-tax-stock-of-properties-2025, read 16 November 2026
  2. Wikipedia, "Eastleigh," https://en.wikipedia.org/wiki/Eastleigh, read 16 November 2026
  3. Wikipedia, "Chandler's Ford," https://en.wikipedia.org/wiki/Chandler%27s_Ford, read 16 November 2026
  4. Wikipedia, "Hedge End," https://en.wikipedia.org/wiki/Hedge_End, read 16 November 2026
  5. Wikipedia, "Bishopstoke," https://en.wikipedia.org/wiki/Bishopstoke, read 16 November 2026
  6. Wikipedia, "Scottish and Southern Electricity Networks," https://en.wikipedia.org/wiki/Scottish_and_Southern_Electricity_Networks, read 16 November 2026
  7. planning.data.gov.uk, conservation areas and article 4 directions, Eastleigh Borough Council, https://www.planning.data.gov.uk/entity/?dataset=conservation-area&organisation_entity=117, read 16 November 2026
  8. legislation.gov.uk, General Permitted Development Order 2015, Schedule 2, Part 14, https://www.legislation.gov.uk/uksi/2015/596/schedule/2/part/14, read 16 November 2026
  9. NESO, "GIS Boundaries for GB DNO Licence Areas," https://www.neso.energy/data-portal/gis-boundaries-gb-dno-license-areas, read 16 November 2026
  10. SSEN, "Nursling Grid Supply Point: Strategic Development Plan," February 2026, listed at https://www.ssen.co.uk/about-ssen/dso/publications-and-reports/dso-consultation-library/, read 16 November 2026
  11. SSEN, "Installation of up to 3.68kW per phase at one property," https://www.ssen.co.uk/our-services/new-supplies/generation-connections/micro-generation-connections/installations-up-to-3.68kw-per-phase-at-a-single-premises, read 16 November 2026
  12. SSEN, "Large scale microgeneration (Installations above 3.68kW per phase, but 50kW or less)," https://www.ssen.co.uk/our-services/new-supplies/generation-connections/micro-generation-connections/installations-above-3.68kw-per-phase-but-50kw-or-less, read 16 November 2026

Frequently asked questions

No obligation

Ask for a call back about solar in Eastleigh.

What type of property is it?

What are you looking for?

Name, postcode and phone are needed. The rest is optional.

We use what you send here to answer you. If you said yes to advert matching in the cookie choices, Google Ads also receives your email address and phone number in scrambled (hashed) form, to match this enquiry to our adverts. See the privacy policy.

Six panels, no battery, from

£6,000

Six panels with a 6kWh battery from £7,800. Fixed in writing after a free survey.

  1. We ring you back to talk through your home and what you want.
  2. A free survey checks your roof, loft and electrics.
  3. Your price is fixed in writing, and you have 14 days to change your mind.

Rather see a figure first? Get your guide price online, or call 01202 161222.