Rated 5.0 on Google

Solar in Exeter

Six panels fully installed from £6,000, or £7,800 with a 6kWh battery. Scaffolding and 0% VAT included, and a free survey fixes your price in writing.

Keeley Shaw
Recently had 8 panels installed and Henry & theo were really polite and professional. From start to finish everything was great and no mess was made or left behind. Excellent - ⭐️⭐️⭐️⭐️⭐️

Google review, October 2026Solar

Get your guide price

What type of property is it?

What are you looking for?

Rated 5.0on Google
MCScertified, NAP/83770/26/1
Free surveyno obligation
Fixed pricein writing after survey
0% VATends 31 March 2027

Areas we cover

In and around Exeter.

The same published prices apply everywhere in Exeter, and the survey is free. We cover Exeter from our office in Poole.

  • Heavitree
  • St Leonard's
  • Pennsylvania
  • Polsloe
  • St Thomas
  • Exwick
  • Alphington
  • Topsham
  • Pinhoe
  • Southernhay
  • St Sidwells
  • Belmont
  • Cranbrook
  • Exminster

At a glance

What decides a solar job in Exeter.

  • PlanningExeter City Council, with Cranbrook in East Devon
  • Homes8,550 of 61,790 homes built before 1900, and 6,930 between 1930 and 1939
  • Grid operatorNGED, checked across 1,336 postcodes
  • Conservation20 conservation areas, the oldest Topsham (1967) and St Leonard's (1968)

Guide prices in Exeter

Fully installed with DMEGC 465W all-black panels, a battery-ready hybrid inverter, scaffolding and 0% VAT. The same table applies everywhere we work, and your survey fixes the price in writing.

Guide prices by number of panels and battery option, fully installed with scaffolding and 0% VAT
SystemOutputSolar only+ 6kWh battery+ 12kWh battery
6 panels2.79 kWp£6,000£7,800£9,500
8 panels3.72 kWp£6,400£8,200£9,900
10 panels4.65 kWp£6,800£8,500£10,100
12 panels5.58 kWp£7,200£8,900£10,500

0% VAT on qualifying installations until 31 March 2027, then 5%. What qualifies, or see every price and what can change it.

Call 01202 161222

Every installation

What every price includes

  • DMEGC 465W all-black panels
  • Hybrid inverter, battery-ready from day one
  • Battery where selected, set up for off-peak charging
  • Scaffolding, put up and taken down
  • Bird protection around the panels
  • Monitoring app, set up before we leave
  • Grid connection paperwork and handover pack
  • Help registering for export payments

Batteries and inverters from Fox ESS, Tesla, Sigenergy, Sunsynk and Powervault, named on your written quote. Backup through a power cut, for key circuits or the whole home, is priced at survey.

A Pro-Fit installer in a branded hard hat, hi-vis and work gloves stepping across a finished all-black solar array, one hand on a panel
Installed by Pro-Fit

What customers say about Pro-Fit.

Reviews
5.0
See our reviews on Google
  • Sam HoltonGoogle review, October 2026
    Layout of the panels are spot on, the team put in graft the last 2 days, big job done properly and smoothly! Excited to see the returns from this install!
    Solar
  • safia segouiniGoogle review, October 2026
    Would definitely recommend to anyone considering solar. Really happy with the service from Pro Fit. The whole process was smooth from start to finish, and the team were friendly, professional and kept me informed throughout. The solar panels look great and everything was installed neatly and efficiently.
    Solar
  • jakGoogle review, September 2026
    Used them for panels and a battery. Fraser and Theo were professional from start to finish. Would definitely recommend. The design and layout were perfect.
    Solar and battery
  • Elias MugotGoogle review, September 2026
    Really appreciated the team didn’t try to upsell me. Connor was able to help looking at our usage, roof angle and shading and design a good design that actually made sense for us going forward.
    Solar design
  • BenGoogle review, September 2026
    Great work, the team arrived on time and have worked relentlessly to get the panels installed, was a 8 panel install and it looks superb, im pleased as they dont look ugly and actually compliment our new slate roof.
    Solar
  • Max WareGoogle review, September 2026
    Fraser installed 6 panels and the system is now up and running too. We cant wait to see the returns and we are so glad we've taken the step earlier rather than later. Thank you!
    Solar
  • AhmadGoogle review, September 2026
    Aaron has been a pleasure, the office when calling in were also super polite. Will definitely be using for future solar jobs on our other commercial properties.
    Commercial solar

How it works

  1. A guide price, or a call

    Answer five short questions for a guide price on screen, or ring us. We design a system around your roof and how you use electricity.

  2. Free home survey

    A surveyor checks your roof, loft, electrics and access. Your price is then fixed in writing, and you have 14 days to change your mind.

  3. Installation

    Usually one to two days on site, with scaffolding included in the price. We commission the system and notify the grid operator for you.

The local detail

What changes a solar job in Exeter.

We cover Exeter, and most houses in the city can take roof panels without a planning application. What varies is the house: Victorian terraces in Heavitree, 19th-century streets in St Leonard's, interwar semis and post-war rebuilding in the centre, across 20 conservation areas and beside a river that flooded Exwick and St Thomas in 1960. Our Devon page covers the rest of the county, and our prices are published.

How old is my Exeter house likely to be?

It depends on the street. The Valuation Office Agency counts 61,790 homes in Exeter, of which 8,550 were built before 1900, 3,530 between 1900 and 1918, and 6,930 between 1930 and 1939 (Valuation Office Agency, table CTSOP4.1, Exeter, at 31 March 2026). The older stock is concentrated. In the statistical area the House of Commons Library calls Heavitree West & Polsloe, 1,040 of 3,520 homes predate 1900 and another 790 date from 1900 to 1918. In St Leonard's, 1,010 of 3,160 predate 1900.

War left gaps. The 1942 Baedeker raids destroyed 1,500 of the city's 20,000 houses and badly damaged 2,700 more. Much of Bedford Circus and parts of Sidwell Street and Paris Street were lost, and an earlier raid hit Pennsylvania4. Much of the centre was rebuilt after the war3.

Heavitree stone, a red sandstone once quarried in Heavitree, built many of Exeter's older buildings, the Guildhall among them5. In Topsham, part of the city since 1966, many houses are of imported Dutch brick, with Dutch gables6.

What does that mean for the roof?

On a Victorian or Edwardian terrace, the main roof is often split by chimney stacks and a rear outrigger, so the usable area is smaller than it looks from the street. Valleys and dormers need the panels laid out around them, and we check the chimneys for shade at different times of year. On slate, fixings go in with flashing plates or replacement slates; on clay or concrete tile, hooks sit under the tiles.

Many interwar semis have hipped roofs, which leave less space on each slope than a gable end would. That rarely rules panels out, but it can decide how many fit. Where a roof needs replacing anyway, panels set into the roof instead of on top are worth asking about at survey.

Is my street in one of Exeter's 20 conservation areas?

Quite possibly. Exeter City Council says there are 20 conservation areas in the city8. The oldest are Topsham, designated on 14 December 1967, and St Leonard's, on 29 August 1968; Heavitree followed in 1983, Pennsylvania in 1984, and Central, around the cathedral, in 1992 (planning.data.gov.uk, Exeter City Council conservation areas). Others include Southernhay and The Friars, St David's, Mont Le Grand, Belmont, St Sidwells, Alphington and Exwick. The city also has over 1,800 listed buildings3.

None of that bans solar. In a conservation area, panels cannot go on a wall, balcony or roof enclosure that fronts a highway, and a flat roof needs a prior approval application first; a listed house cannot use permitted development for solar at all (legislation.gov.uk, General Permitted Development Order 2015, Schedule 2, Part 14). On a terrace, the rear slope is often the one that works. Our guide to solar panels in a conservation area explains the choices.

Which council decides, and will that change?

Exeter City Council decides for the city, Topsham included. Just outside, the answer changes: Cranbrook, the new town to the east, is in East Devon7. That may not last. Under local government restructuring plans, Exeter is due to become a unitary authority from 2028, taking in parishes from East Devon, Teignbridge and Mid Devon3. Until then, your current district council takes any application. Our planning permission guide sets out when you need one at all.

Which grid operator covers Exeter?

National Grid Electricity Distribution (NGED), through its South West area. We checked 1,336 postcodes in the Exeter council area, across EX1 to EX5, against the licence area map published by the National Energy System Operator, and every one is in NGED's South West area. So are the points we checked at Topsham, Pinhoe, Alphington, Exwick, Heavitree, Cranbrook and Exminster. The nearest other operator's area is about 50 km away. NGED's own 2026 network plans for the South West refer to the Exeter Main and Exeter City bulk supply points13.

For a typical home system, we notify NGED after the installation: the Energy Networks Association's guide says generation of 16 amps or less per phase needs no contact with the operator in advance. A bigger system, or a battery that would push your export over that limit, needs NGED's approval before it is connected. Pro-Fit submits it, and the paperwork is in your handover pack.

Does the river still matter in St Thomas and Exwick?

For where a battery goes, yes. On 27 October 1960 the Exe burst its banks and flooded large parts of the city, including Exwick, St Thomas and Alphington; new defences, with three flood relief channels, followed from 19653. The Environment Agency's flood zones 2 and 3 still take in the points we checked in St Thomas and Exwick, though not those at the cathedral or in Heavitree (planning.data.gov.uk, flood risk zones).

If you live on the low ground by the river, tell us whether your home has ever flooded. An inverter and battery belong above any level the property has seen, which can rule out a garage floor. Our battery storage page explains the options.

Sources for this page (15)
  1. Valuation Office Agency, "Council Tax: stock of properties, 2026," table CTSOP4.1, https://www.gov.uk/government/statistics/council-tax-stock-of-properties-2026, read 16 November 2026
  2. House of Commons Library, "MSOA Names," https://houseofcommonslibrary.github.io/msoanames/, read 16 November 2026
  3. Wikipedia, "Exeter," https://en.wikipedia.org/wiki/Exeter, read 16 November 2026
  4. Wikipedia, "Exeter Blitz," https://en.wikipedia.org/wiki/Exeter_Blitz, read 16 November 2026
  5. Wikipedia, "Heavitree," https://en.wikipedia.org/wiki/Heavitree, read 16 November 2026
  6. Wikipedia, "Topsham, Devon," https://en.wikipedia.org/wiki/Topsham,_Devon, read 16 November 2026
  7. Wikipedia, "Cranbrook, Devon," https://en.wikipedia.org/wiki/Cranbrook,_Devon, read 16 November 2026
  8. Exeter City Council, "Conservation Areas: Appraisals and Management Plans," https://exeter.gov.uk/planning-services/heritage/conservation-areas/appraisals-and-management-plans/, read 16 November 2026
  9. planning.data.gov.uk, conservation area "Topsham," https://www.planning.data.gov.uk/entity/44015010, read 16 November 2026
  10. planning.data.gov.uk, conservation area "St Leonards," https://www.planning.data.gov.uk/entity/44015000, read 16 November 2026
  11. planning.data.gov.uk, "Flood risk zone," https://www.planning.data.gov.uk/dataset/flood-risk-zone, read 16 November 2026
  12. National Energy System Operator, "GIS Boundaries for GB DNO Licence Areas," https://www.neso.energy/data-portal/gis-boundaries-gb-dno-license-areas, read 16 November 2026
  13. National Grid Electricity Distribution, "DNOA 2026 South West scheme pages," https://dso.nationalgrid.co.uk/downloads/15120/dnoa-2026-south-west-scheme-pages.pdf, read 16 November 2026
  14. Energy Networks Association, "Distributed Generation Connection Guides: G98 for Single Premises," https://connections.nationalgrid.co.uk/downloads/79200/g98-single-premises.pdf, read 16 November 2026
  15. legislation.gov.uk, General Permitted Development Order 2015, Schedule 2, Part 14, https://www.legislation.gov.uk/uksi/2015/596/schedule/2/part/14, read 16 November 2026

Frequently asked questions

No obligation

Ask for a call back about solar in Exeter.

What type of property is it?

What are you looking for?

Name, postcode and phone are needed. The rest is optional.

We use what you send here to answer you. If you said yes to advert matching in the cookie choices, Google Ads also receives your email address and phone number in scrambled (hashed) form, to match this enquiry to our adverts. See the privacy policy.

Six panels, no battery, from

£6,000

Six panels with a 6kWh battery from £7,800. Fixed in writing after a free survey.

  1. We ring you back to talk through your home and what you want.
  2. A free survey checks your roof, loft and electrics.
  3. Your price is fixed in writing, and you have 14 days to change your mind.

Rather see a figure first? Get your guide price online, or call 01202 161222.