Rated 5.0 on Google

Solar in Wimborne

Six panels fully installed from £6,000, or £7,800 with a 6kWh battery. Scaffolding and 0% VAT included, and a free survey fixes your price in writing.

Sam Holton
Layout of the panels are spot on, the team put in graft the last 2 days, big job done properly and smoothly! Excited to see the returns from this install!

Google review, October 2026Solar

Get your guide price

What type of property is it?

What are you looking for?

Rated 5.0on Google
MCScertified, NAP/83770/26/1
Free surveyno obligation
Fixed pricein writing after survey
0% VATends 31 March 2027

Areas we cover

In and around Wimborne.

The same published prices apply everywhere in Wimborne, and the survey is free. We cover Wimborne from our office in Poole.

  • Colehill
  • Leigh Park
  • Merley
  • Pamphill
  • Cowgrove
  • Kingston Lacy
  • Corfe Mullen
  • Canford Magna
  • Holt
  • Furzehill
  • Sturminster Marshall
  • Witchampton
  • Wimborne St Giles

At a glance

What decides a solar job in Wimborne.

  • PlanningDorset Council; BCP Council in Merley
  • HomesGeorgian slate in the centre, 1970s estates, thatch in Pamphill and Cowgrove
  • Grid operatorSSEN, checked across BH21
  • ConservationWimborne Minster conservation area, designated in 1970

Guide prices in Wimborne

Fully installed with DMEGC 465W all-black panels, a battery-ready hybrid inverter, scaffolding and 0% VAT. The same table applies everywhere we work, and your survey fixes the price in writing.

Guide prices by number of panels and battery option, fully installed with scaffolding and 0% VAT
SystemOutputSolar only+ 6kWh battery+ 12kWh battery
6 panels2.79 kWp£6,000£7,800£9,500
8 panels3.72 kWp£6,400£8,200£9,900
10 panels4.65 kWp£6,800£8,500£10,100
12 panels5.58 kWp£7,200£8,900£10,500

0% VAT on qualifying installations until 31 March 2027, then 5%. What qualifies, or see every price and what can change it.

Call 01202 161222

Every installation

What every price includes

  • DMEGC 465W all-black panels
  • Hybrid inverter, battery-ready from day one
  • Battery where selected, set up for off-peak charging
  • Scaffolding, put up and taken down
  • Bird protection around the panels
  • Monitoring app, set up before we leave
  • Grid connection paperwork and handover pack
  • Help registering for export payments

Batteries and inverters from Fox ESS, Tesla, Sigenergy, Sunsynk and Powervault, named on your written quote. Backup through a power cut, for key circuits or the whole home, is priced at survey.

A Pro-Fit installer in a hard hat and hi-vis lifting an all-black solar panel onto a domestic roof, access platform behind him
Installed by Pro-Fit

What customers say about Pro-Fit.

Reviews
5.0
See our reviews on Google
  • Keeley ShawGoogle review, October 2026
    Recently had 8 panels installed and Henry & theo were really polite and professional. From start to finish everything was great and no mess was made or left behind. Excellent - ⭐️⭐️⭐️⭐️⭐️
    Solar
  • safia segouiniGoogle review, October 2026
    Would definitely recommend to anyone considering solar. Really happy with the service from Pro Fit. The whole process was smooth from start to finish, and the team were friendly, professional and kept me informed throughout. The solar panels look great and everything was installed neatly and efficiently.
    Solar
  • jakGoogle review, September 2026
    Used them for panels and a battery. Fraser and Theo were professional from start to finish. Would definitely recommend. The design and layout were perfect.
    Solar and battery
  • Elias MugotGoogle review, September 2026
    Really appreciated the team didn’t try to upsell me. Connor was able to help looking at our usage, roof angle and shading and design a good design that actually made sense for us going forward.
    Solar design
  • BenGoogle review, September 2026
    Great work, the team arrived on time and have worked relentlessly to get the panels installed, was a 8 panel install and it looks superb, im pleased as they dont look ugly and actually compliment our new slate roof.
    Solar
  • Max WareGoogle review, September 2026
    Fraser installed 6 panels and the system is now up and running too. We cant wait to see the returns and we are so glad we've taken the step earlier rather than later. Thank you!
    Solar
  • AhmadGoogle review, September 2026
    Aaron has been a pleasure, the office when calling in were also super polite. Will definitely be using for future solar jobs on our other commercial properties.
    Commercial solar

How it works

  1. A guide price, or a call

    Answer five short questions for a guide price on screen, or ring us. We design a system around your roof and how you use electricity.

  2. Free home survey

    A surveyor checks your roof, loft, electrics and access. Your price is then fixed in writing, and you have 14 days to change your mind.

  3. Installation

    Usually one to two days on site, with scaffolding included in the price. We commission the system and notify the grid operator for you.

The local detail

What changes a solar job in Wimborne.

Yes, we fit solar panels and batteries in Wimborne Minster and the villages around it, from Colehill and Leigh Park to Pamphill, Corfe Mullen and Witchampton. Most homes here can take roof panels without a planning application. Wimborne's roofs and surroundings need more checking than most, though: a Georgian centre under slate, thatched cottages on the Kingston Lacy estate, and a National Landscape to the north. Guide prices start from £6,000 for 6 panels, and our prices page shows the full table. 0% VAT on qualifying installations until 31 March 2027, then 5%. Our Dorset page covers the rest of the county.

Who decides planning in Wimborne, Colehill and Merley?

For most of the area, Dorset Council, which replaced East Dorset District Council and four others in April 2019 (Valuation Office Agency, "Council Tax: stock of properties, 2026," note 11). Merley is the exception. It shares the BH21 postcode, but it sits in BCP Council's Bearwood and Merley ward, and Canford Magna nearby is one of BCP's conservation areas. Our Poole page covers that side.

North of the town, the Cranborne Chase National Landscape takes in Witchampton, Gussage All Saints, Wimborne St Giles, Hinton and Horton5. On a pitched roof that changes little. A flat roof there, or a ground-mounted array within 5 metres of your boundary, needs a prior approval application to the council before work starts (legislation.gov.uk, Part 14).

What does the Wimborne Minster conservation area mean for my roof?

East Dorset's appraisal records that Wimborne Minster was designated in 1970, soon after the law first created conservation areas, then raised to "Outstanding Conservation Area" status, and extended in 1981 and 1992 (East Dorset District Council, Supplementary Planning Guidance No.15, April 2006). At its heart is the Minster itself, Grade I listed, which has housed a chained library since 1686.

The appraisal describes the roofs street by street. West Borough is a row of mostly Georgian townhouses, several with rooms in the roof lit by small dormers, with "extensive use of slate for the roofs"; Nos. 39 and 41 are a pair of 17th century thatched cottages among them. Leigh Road's roofscape is "predominantly of slate", with the thatched Turnpike Cottage as a reminder that thatch was once common in the town.

St John's Hill and Rowlands Hill, the Victorian suburb that grew east of the centre after the railway arrived in 1847, has its own conservation area, designated in March 1981. Its houses share red-orange brick and Welsh slate roofs with deep eaves (East Dorset District Council, Supplementary Planning Guidance No.11, April 2006).

A conservation area does not ban panels. Inside the boundary, permitted development still covers most roof slopes; what it rules out is panels on a wall, balcony or roof enclosure facing the road. A listed house needs consent first. Our guide to solar panels in conservation areas covers placement and design choices.

How old are the houses around Wimborne?

Many are either old or from the 1960s and 1970s. The Valuation Office Agency counts 33,370 homes in the Dorset Council area built before 1900, out of 188,900, and then a second wave: 20,760 built between 1965 and 1972 and 22,450 between 1973 and 1982 (Table CTSOP4.0, 31 March 2026). They cover the whole Dorset Council area, but the Wimborne area fits the pattern. Colehill grew from 1,786 people in 1951 to 5,370 in 1971 as large estates of family homes went up2, and Merley's estate around Sopwith Crescent was built in the 1970s (Wikipedia, "Merley").

Estate houses of that era usually have concrete tile roofs, the simplest kind to fix to. The Victorian and Georgian houses take more care, because each hook on slate is fixed beneath the slates and cracked slates are replaced. On St John's Hill, East Dorset's appraisal notes that some original slate was swapped for large concrete tiles in the 1980s, so two neighbouring houses can need different fixings. If your roof is due for replacement, in-roof solar is fitted as part of the new covering.

Can a thatched cottage in Pamphill or Cowgrove have solar?

Not on the thatch itself. Pamphill is part of the Kingston Lacy Estate, owned and run by the National Trust, and Cowgrove is a linear settlement of thatched cottages and farmsteads that has changed little over the centuries. Many of their cottages and farmhouses are listed, Pamphill Manor at Grade II* (East Dorset District Council, Supplementary Planning Guidance No.9, April 2006). If you rent from the estate, the owner's agreement comes first.

Instead, the usual answers are an outbuilding with a tiled or slate roof, or a ground-mounted array in the garden, which has its own height and boundary limits under Part 14 and is not permitted within the curtilage of a listed building. We look at both at the free survey and tell you plainly if neither works.

Which grid operator covers Wimborne, and what does the application involve?

SSEN, under its Southern Electric Power Distribution licence, across the BH21 area. We checked postcodes in Wimborne town, Colehill, Merley, Corfe Mullen, Pamphill and Hinton on SSEN's "Who is my distributor?" lookup, and every result named SSEN6. On NESO's licence area map they all sit well inside SSEN's southern England area, so the council split between Dorset and BCP makes no difference to the grid.

A typical home system is installed first and SSEN is notified afterwards; SSEN's guidance sets that route for systems of 3.68kW or less per phase. A larger array, or a battery that takes your export over that limit, needs SSEN's approval before it is connected. We submit whichever applies, and the paperwork is in your handover pack.

Sources for this page (8)
  1. Wikipedia, "Wimborne Minster," https://en.wikipedia.org/wiki/Wimborne_Minster, and "Wimborne Minster (church)," https://en.wikipedia.org/wiki/Wimborne_Minster_(church), read 16 November 2026
  2. Wikipedia, "Colehill," https://en.wikipedia.org/wiki/Colehill, and "Merley," https://en.wikipedia.org/wiki/Merley, read 16 November 2026
  3. East Dorset District Council, Supplementary Planning Guidance No.9 (Pamphill), No.11 (St John's Hill and Rowlands Hill) and No.15 (Wimborne Minster), April 2006, via Dorset Council, https://www.dorsetcouncil.gov.uk/w/conservation-area-appraisals-east-dorset, read 16 November 2026
  4. Valuation Office Agency, "Council Tax: stock of properties, 2026," Table CTSOP4.0 and notes, https://www.gov.uk/government/statistics/council-tax-stock-of-properties-2026, read 16 November 2026
  5. planning.data.gov.uk, "Area of outstanding natural beauty" and "Flood risk zone" (Environment Agency) datasets, https://www.planning.data.gov.uk/dataset/area-of-outstanding-natural-beauty, read 16 November 2026
  6. SSEN, "Who is my distributor?," https://www.ssen.co.uk/about-ssen/who-is-my-distributor/, and "Installation of up to 3.68kW per phase at one property," https://www.ssen.co.uk/our-services/new-supplies/generation-connections/micro-generation-connections/installations-up-to-3.68kw-per-phase-at-a-single-premises/, read 16 November 2026
  7. NESO, "GIS Boundaries for GB DNO Licence Areas," https://www.neso.energy/data-portal/gis-boundaries-gb-dno-license-areas, read 16 November 2026
  8. legislation.gov.uk, The Town and Country Planning (General Permitted Development) Order 2015, Schedule 2, Part 14, https://www.legislation.gov.uk/uksi/2015/596/schedule/2/part/14, read 16 November 2026

Frequently asked questions

No obligation

Ask for a call back about solar in Wimborne.

What type of property is it?

What are you looking for?

Name, postcode and phone are needed. The rest is optional.

We use what you send here to answer you. If you said yes to advert matching in the cookie choices, Google Ads also receives your email address and phone number in scrambled (hashed) form, to match this enquiry to our adverts. See the privacy policy.

Six panels, no battery, from

£6,000

Six panels with a 6kWh battery from £7,800. Fixed in writing after a free survey.

  1. We ring you back to talk through your home and what you want.
  2. A free survey checks your roof, loft and electrics.
  3. Your price is fixed in writing, and you have 14 days to change your mind.

Rather see a figure first? Get your guide price online, or call 01202 161222.