Rated 5.0 on Google

Solar in Bridgwater

Six panels fully installed from £6,000, or £7,800 with a 6kWh battery. Scaffolding and 0% VAT included, and a free survey fixes your price in writing.

Keeley Shaw
Recently had 8 panels installed and Henry & theo were really polite and professional. From start to finish everything was great and no mess was made or left behind. Excellent - ⭐️⭐️⭐️⭐️⭐️

Google review, October 2026Solar

Get your guide price

What type of property is it?

What are you looking for?

Rated 5.0on Google
MCScertified, NAP/83770/26/1
Free surveyno obligation
Fixed pricein writing after survey
0% VATends 31 March 2027

Areas we cover

In and around Bridgwater.

The same published prices apply everywhere in Bridgwater, and the survey is free. We cover Bridgwater from our office in Poole.

  • Wembdon
  • Durleigh
  • North Petherton
  • Cannington
  • Puriton
  • Woolavington
  • Bawdrip
  • Westonzoyland
  • Huntworth
  • Pawlett
  • Chilton Trinity
  • Dunwear
  • Eastover
  • Sydenham

At a glance

What decides a solar job in Bridgwater.

  • PlanningSomerset Council, since Sedgemoor was abolished in 2023
  • RoofsClay Double Roman tiles, credited to William Symons, and post-war concrete tile
  • Flood riskTidal Parrett, with a barrier being built between Express Park and Chilton Trinity
  • Grid operatorNGED, South West licence area, checked across 30 postcodes

Guide prices in Bridgwater

Fully installed with DMEGC 465W all-black panels, a battery-ready hybrid inverter, scaffolding and 0% VAT. The same table applies everywhere we work, and your survey fixes the price in writing.

Guide prices by number of panels and battery option, fully installed with scaffolding and 0% VAT
SystemOutputSolar only+ 6kWh battery+ 12kWh battery
6 panels2.79 kWp£6,000£7,800£9,500
8 panels3.72 kWp£6,400£8,200£9,900
10 panels4.65 kWp£6,800£8,500£10,100
12 panels5.58 kWp£7,200£8,900£10,500

0% VAT on qualifying installations until 31 March 2027, then 5%. What qualifies, or see every price and what can change it.

Call 01202 161222

Every installation

What every price includes

  • DMEGC 465W all-black panels
  • Hybrid inverter, battery-ready from day one
  • Battery where selected, set up for off-peak charging
  • Scaffolding, put up and taken down
  • Bird protection around the panels
  • Monitoring app, set up before we leave
  • Grid connection paperwork and handover pack
  • Help registering for export payments

Batteries and inverters from Fox ESS, Tesla, Sigenergy, Sunsynk and Powervault, named on your written quote. Backup through a power cut, for key circuits or the whole home, is priced at survey.

A Pro-Fit installer lifting an all-black solar panel into place on a tiled roof, mounting rails already run
Installed by Pro-Fit

What customers say about Pro-Fit.

Reviews
5.0
See our reviews on Google
  • Sam HoltonGoogle review, October 2026
    Layout of the panels are spot on, the team put in graft the last 2 days, big job done properly and smoothly! Excited to see the returns from this install!
    Solar
  • safia segouiniGoogle review, October 2026
    Would definitely recommend to anyone considering solar. Really happy with the service from Pro Fit. The whole process was smooth from start to finish, and the team were friendly, professional and kept me informed throughout. The solar panels look great and everything was installed neatly and efficiently.
    Solar
  • jakGoogle review, September 2026
    Used them for panels and a battery. Fraser and Theo were professional from start to finish. Would definitely recommend. The design and layout were perfect.
    Solar and battery
  • Elias MugotGoogle review, September 2026
    Really appreciated the team didn’t try to upsell me. Connor was able to help looking at our usage, roof angle and shading and design a good design that actually made sense for us going forward.
    Solar design
  • BenGoogle review, September 2026
    Great work, the team arrived on time and have worked relentlessly to get the panels installed, was a 8 panel install and it looks superb, im pleased as they dont look ugly and actually compliment our new slate roof.
    Solar
  • Max WareGoogle review, September 2026
    Fraser installed 6 panels and the system is now up and running too. We cant wait to see the returns and we are so glad we've taken the step earlier rather than later. Thank you!
    Solar
  • AhmadGoogle review, September 2026
    Aaron has been a pleasure, the office when calling in were also super polite. Will definitely be using for future solar jobs on our other commercial properties.
    Commercial solar

How it works

  1. A guide price, or a call

    Answer five short questions for a guide price on screen, or ring us. We design a system around your roof and how you use electricity.

  2. Free home survey

    A surveyor checks your roof, loft, electrics and access. Your price is then fixed in writing, and you have 14 days to change your mind.

  3. Installation

    Usually one to two days on site, with scaffolding included in the price. We commission the system and notify the grid operator for you.

The local detail

What changes a solar job in Bridgwater.

Yes, we cover Bridgwater for solar panels and batteries, on both banks of the Parrett and out to Wembdon, Durleigh and North Petherton. Prices start from £6,000 for 6 panels, and our prices page has the full table. What is particular to Bridgwater is the clay tile its own works once made, a tidal river and some fine Georgian streets. Our Somerset page covers the wider county.

Are Bridgwater's clay tile roofs a problem for solar?

No, but they need care. Bridgwater became "a major manufacturing centre for clay tiles and bricks in the 19th century", shipping them out through its port, and the Somerset Brick and Tile Museum on East Quay keeps a restored bottle oven1. The town council's history of the trade credits William Symons with the Double Roman roof tile, and says brickyards spread "from Burnham-on-Sea to Burrowbridge"2. So an older roof here may well be clay, often in that deep Double Roman profile.

Clay is brittle, and an old Double Roman does not forgive a careless boot. Each roof hook has to clear the tile above it, which usually means grinding a notch in that tile's underside. Ask us to check the battens and the underlay as well: on a roof that is already slipping, fixing panels to it only postpones the real job. Where a re-roof is due anyway, in-roof solar replaces part of the tiling with the panels themselves.

How old are the houses on Bridgwater's estates?

Mostly younger than the town centre. The first council estate went up in the 1930s at Kendale Road, followed by Bristol Road, and the 1950s brought estates at Sydenham and Rhode Lane and the former cooperative estate near Durleigh1. Since then the built-up area has spread to Dunwear and King's Drive in Bridgwater Without and to new housing on the southern and western edges, in North Petherton, Durleigh and Wembdon parishes.

The Valuation Office Agency's Somerset figures show how much of the county's housing came later: 14,020 homes built in the 1930s, then 14,320 between 1945 and 1954, 20,470 between 1955 and 1964, 24,430 between 1965 and 1972 and 27,440 between 1973 and 1982 (Valuation Office Agency, "Council Tax: stock of properties, 2026," table CTSOP4.1, at 31 March 2026). Somerset is one council in those tables, so they cover the whole county rather than Bridgwater alone.

For panels, a post-war semi is often the simplest roof in town: concrete interlocking tiles, a plain slope and room for a full row. A hipped roof loses some space at each end, so the survey counts panels rather than assuming them.

What does the tidal Parrett mean for an install?

Mainly, where the battery and inverter go. The Environment Agency puts tidal flood risk in Bridgwater at 11,300 homes and 1,500 businesses, and with Somerset Council it is building the Bridgwater Tidal Barrier, a gate structure across the Parrett between Express Park and Chilton Trinity (Environment Agency, "Bridgwater tidal barrier scheme," published 30 March 2026). The Agency's flood warning areas cover low-lying streets on the tidal river, including Manley Gardens and East Quay, and a second covering Taunton Road, Southgate Avenue, Binford Place, Chilton Street and Robins Drive (Environment Agency, flood warning areas for the tidal River Parrett at Bridgwater).

None of that stops panels on a roof. It does mean we put the inverter and battery on a wall, well clear of the floor, and keep them out of a garage or outbuilding that has flooded before. Eastover, Dunball and Chilton Trinity sit close to the river, so tell us at the survey if water has ever come in.

Do I need planning permission in Bridgwater?

Usually not. The planning authority is Somerset Council, since Sedgemoor District Council was abolished in 20231, and roof panels on most houses are permitted development within the national limits, which our guide to planning permission for solar panels sets out.

The exceptions cluster in the centre. Bridgwater Central Area and Dock and Bridgwater Northfield were designated as conservation areas in 1991 and Bridgwater St John's in 19776. In those, panels cannot go on a wall, balcony or roof enclosure, such as a parapet, that fronts a highway, and a flat roof needs prior approval first (General Permitted Development Order 2015, Part 14). Listed buildings lose permitted development for solar altogether. Castle Street, built for the Duke of Chandos, is the obvious case: numbers 11 and 13, built between 1723 and 1728, are Grade I, and so is the Church of St Mary1. Somerset Council also publishes the former Sedgemoor district's article 4 directions as one document, which we check against your address7.

West of town, the Quantock Hills National Landscape begins just beyond Enmore (planning.data.gov.uk), and Cannington, Nether Stowey and Spaxton each have their own conservation area. On a cottage in one of those villages, the rear slope or an outbuilding often works where the front would draw attention.

Who is the grid operator in Bridgwater, and who applies?

National Grid Electricity Distribution (NGED), which used to trade as Western Power Distribution and "powers the Midlands, South West and South Wales" (nationalgrid.co.uk). We checked 30 postcodes across Bridgwater, North Petherton, Cannington, Puriton and Stawell against the National Energy System Operator's licence area map: all of them sit inside NGED's South West area, more than 20 kilometres from any other operator.

Pro-Fit makes the application. A typical home system, up to 16A per phase (about 3.68kW), is notified to NGED after installation. A larger system, or a battery set up to export beyond that limit, needs NGED's approval before it is connected (NGED, G98 and G99 connection procedures). Either way the paperwork ends up in your handover pack.

Sources for this page (11)
  1. Wikipedia, "Bridgwater," https://en.wikipedia.org/wiki/Bridgwater, read 16 November 2026
  2. Bridgwater Town Council, "The Brick and Tile Trade," https://bridgwater-tc.gov.uk/history/19th-century/the-brick-and-tile-trade/, read 16 November 2026
  3. Environment Agency, "Bridgwater tidal barrier scheme," https://www.gov.uk/government/publications/bridgwater-tidal-barrier-scheme/bridgwater-tidal-barrier-scheme, read 16 November 2026
  4. Environment Agency, "Tidal River Parrett at Bridgwater, Manley Gardens and East Quay areas" and neighbouring flood warning areas, https://check-for-flooding.service.gov.uk/target-area/112FWTBRI01, read 16 November 2026
  5. Valuation Office Agency, "Council Tax: stock of properties, 2026," table CTSOP4.1, https://www.gov.uk/government/statistics/council-tax-stock-of-properties-2026, read 16 November 2026
  6. planning.data.gov.uk, Somerset Council conservation areas and the Quantock Hills National Landscape, https://www.planning.data.gov.uk/entity/?dataset=conservation-area&organisation_entity=10003, read 16 November 2026
  7. Somerset Council, "Article 4 directions," https://www.somerset.gov.uk/planning-buildings-and-land/article-4-directions/, read 16 November 2026
  8. National Grid Electricity Distribution, nationalgrid.co.uk, https://www.nationalgrid.co.uk/, read 16 November 2026
  9. National Grid Electricity Distribution, "G98 connection procedures" and "G99 connection procedures," https://connections.nationalgrid.co.uk/g99-connection-procedures/, read 16 November 2026
  10. National Energy System Operator, "GIS Boundaries for GB DNO Licence Areas," https://www.neso.energy/data-portal/gis-boundaries-gb-dno-license-areas, read 16 November 2026
  11. legislation.gov.uk, General Permitted Development Order 2015, Schedule 2, Part 14, https://www.legislation.gov.uk/uksi/2015/596/schedule/2/part/14, read 16 November 2026

Frequently asked questions

No obligation

Ask for a call back about solar in Bridgwater.

What type of property is it?

What are you looking for?

Name, postcode and phone are needed. The rest is optional.

We use what you send here to answer you. If you said yes to advert matching in the cookie choices, Google Ads also receives your email address and phone number in scrambled (hashed) form, to match this enquiry to our adverts. See the privacy policy.

Six panels, no battery, from

£6,000

Six panels with a 6kWh battery from £7,800. Fixed in writing after a free survey.

  1. We ring you back to talk through your home and what you want.
  2. A free survey checks your roof, loft and electrics.
  3. Your price is fixed in writing, and you have 14 days to change your mind.

Rather see a figure first? Get your guide price online, or call 01202 161222.