Rated 5.0 on Google

Solar in Frome

Six panels fully installed from £6,000, or £7,800 with a 6kWh battery. Scaffolding and 0% VAT included, and a free survey fixes your price in writing.

Elias Mugot
Really appreciated the team didn’t try to upsell me. Connor was able to help looking at our usage, roof angle and shading and design a good design that actually made sense for us going forward.

Google review, September 2026Solar design

Get your guide price

What type of property is it?

What are you looking for?

Rated 5.0on Google
MCScertified, NAP/83770/26/1
Free surveyno obligation
Fixed pricein writing after survey
0% VATends 31 March 2027

Areas we cover

In and around Frome.

The same published prices apply everywhere in Frome, and the survey is free. We cover Frome from our office in Poole.

  • Trinity
  • Fromefield
  • Innox Hill
  • Welshmill
  • Keyford
  • Critchill
  • Adderwell
  • Beckington
  • Rode
  • Nunney
  • Berkley
  • Buckland Dinham
  • Great Elm
  • Mells

At a glance

What decides a solar job in Frome.

  • PlanningSomerset Council, since Mendip District Council was abolished in 2023
  • Listed buildingsOver 350, more than any other town in Somerset
  • Grid operatorSSEN in the town, with NGED at Mells and Coleford
  • RoofsForest Marble walls under Bridgwater pantiles, Roman tiles and Welsh slate

Guide prices in Frome

Fully installed with DMEGC 465W all-black panels, a battery-ready hybrid inverter, scaffolding and 0% VAT. The same table applies everywhere we work, and your survey fixes the price in writing.

Guide prices by number of panels and battery option, fully installed with scaffolding and 0% VAT
SystemOutputSolar only+ 6kWh battery+ 12kWh battery
6 panels2.79 kWp£6,000£7,800£9,500
8 panels3.72 kWp£6,400£8,200£9,900
10 panels4.65 kWp£6,800£8,500£10,100
12 panels5.58 kWp£7,200£8,900£10,500

0% VAT on qualifying installations until 31 March 2027, then 5%. What qualifies, or see every price and what can change it.

Call 01202 161222

Every installation

What every price includes

  • DMEGC 465W all-black panels
  • Hybrid inverter, battery-ready from day one
  • Battery where selected, set up for off-peak charging
  • Scaffolding, put up and taken down
  • Bird protection around the panels
  • Monitoring app, set up before we leave
  • Grid connection paperwork and handover pack
  • Help registering for export payments

Batteries and inverters from Fox ESS, Tesla, Sigenergy, Sunsynk and Powervault, named on your written quote. Backup through a power cut, for key circuits or the whole home, is priced at survey.

A Pro-Fit installer in a hard hat and hi-vis lifting an all-black solar panel onto a domestic roof, access platform behind him
Installed by Pro-Fit

What customers say about Pro-Fit.

Reviews
5.0
See our reviews on Google
  • Sam HoltonGoogle review, October 2026
    Layout of the panels are spot on, the team put in graft the last 2 days, big job done properly and smoothly! Excited to see the returns from this install!
    Solar
  • Keeley ShawGoogle review, October 2026
    Recently had 8 panels installed and Henry & theo were really polite and professional. From start to finish everything was great and no mess was made or left behind. Excellent - ⭐️⭐️⭐️⭐️⭐️
    Solar
  • safia segouiniGoogle review, October 2026
    Would definitely recommend to anyone considering solar. Really happy with the service from Pro Fit. The whole process was smooth from start to finish, and the team were friendly, professional and kept me informed throughout. The solar panels look great and everything was installed neatly and efficiently.
    Solar
  • jakGoogle review, September 2026
    Used them for panels and a battery. Fraser and Theo were professional from start to finish. Would definitely recommend. The design and layout were perfect.
    Solar and battery
  • BenGoogle review, September 2026
    Great work, the team arrived on time and have worked relentlessly to get the panels installed, was a 8 panel install and it looks superb, im pleased as they dont look ugly and actually compliment our new slate roof.
    Solar
  • Max WareGoogle review, September 2026
    Fraser installed 6 panels and the system is now up and running too. We cant wait to see the returns and we are so glad we've taken the step earlier rather than later. Thank you!
    Solar
  • AhmadGoogle review, September 2026
    Aaron has been a pleasure, the office when calling in were also super polite. Will definitely be using for future solar jobs on our other commercial properties.
    Commercial solar

How it works

  1. A guide price, or a call

    Answer five short questions for a guide price on screen, or ring us. We design a system around your roof and how you use electricity.

  2. Free home survey

    A surveyor checks your roof, loft, electrics and access. Your price is then fixed in writing, and you have 14 days to change your mind.

  3. Installation

    Usually one to two days on site, with scaffolding included in the price. We commission the system and notify the grid operator for you.

The local detail

What changes a solar job in Frome.

We cover Frome for solar panels and batteries, from Trinity and Fromefield out to Beckington, Nunney and Rode, with guide prices from £6,000 for 6 panels and a free survey before any price is fixed. Two things set Frome apart from most of the county: the town is on SSEN's grid rather than NGED's, and it has over 350 listed buildings, more than any other town in Somerset. Our Somerset page covers the wider county.

Which grid operator covers Frome?

Scottish and Southern Electricity Networks (SSEN), which runs the network across central southern England4. Most of Somerset is on National Grid Electricity Distribution (NGED), so this surprises people. On the National Energy System Operator's map of licence areas, every postcode we tested in Frome parish, from BA11 1 to BA11 6, sits in SSEN's Southern England area3.

The line is close, though. The same map puts Mells, Coleford and Cranmore, to the west, on NGED's side, while Nunney, Beckington, Berkley and Rode sit with Frome on SSEN's. NESO calls its boundaries approximate, so we confirm the operator for your postcode at survey.

What the operator needs depends on size. A typical home system is notified to the operator after it is installed. A larger system, or a battery that would take your export over the limit, needs the operator's approval before it is connected. We submit it either way, and the paperwork goes in your handover pack. Our guide to adding a battery to existing solar panels explains the two routes.

What are Frome's roofs like to put panels on?

Mostly stone walls under clay tile, with plenty of Welsh slate. Frome Town Council's design statement, adopted by Mendip District Council in 2015, says the older town is built mainly of locally quarried Forest Marble, a tough limestone, with Bath stone or Doulting stone for dressings. Early houses had stone tiles; Welsh slate and clay tiles arrived with the railway in 18501.

Today the statement describes waves of Bridgwater pantiles and double and triple Roman tiles, with Welsh slate the most common alternative, on a roofscape of gables, dormers and chimney stacks stepping down the hillside. For panels, that means three things. Each roof hook goes under a lifted clay tile, which is refitted over it, and old clay can crack, so we look for matching spares at the survey. Slate takes a different fixing and more care. And dormers, valleys and chimneys break a roof into smaller planes, so the clear area sets how many panels fit. If the roof needs replacing anyway, in-roof solar is worth pricing at the same time.

Old housing is common across the county: the Valuation Office Agency counts 50,270 Somerset homes built before 1900, out of 273,360 on the council tax list at 31 March 2026 (Valuation Office Agency, "Council Tax: stock of properties, 2026," table CTSOP4.1). Frome has newer estates too, mostly around Adderwell5, where a modern roof with one clear slope is usually the simplest job of all.

Can I fit panels on a house in Frome's conservation area?

Often, yes, but check first. Somerset Council is the planning authority, since Mendip District Council was abolished in 20235. Most of the town centre falls inside the Frome conservation area, recorded from 1973 (planning.data.gov.uk, "Frome"). The design statement puts the densest cluster of listed buildings in the town centre and Trinity, and names the former Rook Lane Chapel and the Blue House as Grade I.

Trinity, built between the late 17th and mid 18th centuries, is one of the earliest planned areas of industrial workers' housing in the country5. Wiltshires Barton on Trinity Street, from around 1718, is among the 24 Grade II* buildings the design statement lists.

A listed house cannot use permitted development for solar, so it needs planning permission and listed building consent. In a conservation area, panels cannot go on a wall, balcony or roof enclosure that fronts a highway, and a flat roof needs prior approval first (legislation.gov.uk, SI 2026/896). A rear slope facing away from the street is usually the straightforward option. Frome is not in a National Landscape, so that layer does not apply (planning.data.gov.uk, "Area of outstanding natural beauty"). Our guide to solar panels in conservation areas has the detail.

Do Frome's steep streets change the install?

They change the planning of it. The town centre sits about 65 metres above sea level and the outer parts between 90 and 135 metres, with old streets climbing out of the River Frome valley; Stony Street, leading up to Catherine Hill, is steep and cobbled5. On a street like that, the survey settles where the scaffold stands and how the panels reach the roof, so nothing is improvised on the day.

Which villages around Frome do you cover?

All of them, at the same prices. Beckington, Rode and Nunney each have a conservation area recorded from 1973, Mells from 1970, Buckland Dinham from 1989, and Lullington and Orchardleigh from 1998 (planning.data.gov.uk), so there too we check your address against the boundary. We also cover Berkley, Great Elm and Witham Friary, and Frome's own districts from Innox Hill and Welshmill to Keyford and Critchill. Over the county line, our Wiltshire page covers Warminster and Westbury.

Sources for this page (9)
  1. Frome Town Council, "Frome Town Design Statement" (adopted by Mendip District Council, October 2015), https://www.somerset.gov.uk/planning-buildings-and-land/supplementary-planning-documents/frome-town-design-statement, read 16 November 2026
  2. Valuation Office Agency, "Council Tax: stock of properties, 2026," table CTSOP4.1, Somerset, at 31 March 2026, https://www.gov.uk/government/statistics/council-tax-stock-of-properties-2026, read 16 November 2026
  3. National Energy System Operator, "GIS Boundaries for GB DNO Licence Areas" (licence areas dated 3 May 2024), https://www.neso.energy/data-portal/gis-boundaries-gb-dno-license-areas, read 16 November 2026
  4. Wikipedia, "Scottish and Southern Electricity Networks," https://en.wikipedia.org/wiki/Scottish_and_Southern_Electricity_Networks, read 16 November 2026
  5. Wikipedia, "Frome," https://en.wikipedia.org/wiki/Frome, read 16 November 2026
  6. planning.data.gov.uk, conservation area "Frome," https://www.planning.data.gov.uk/entity/44003958, read 16 November 2026
  7. planning.data.gov.uk, conservation areas "Beckington," "Rode," "Nunney," "Mells," "Buckland Dinham" and "Lullington and Orchardleigh," https://www.planning.data.gov.uk/dataset/conservation-area, read 16 November 2026
  8. planning.data.gov.uk, "Area of outstanding natural beauty," https://www.planning.data.gov.uk/dataset/area-of-outstanding-natural-beauty, read 16 November 2026
  9. legislation.gov.uk, The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2026, SI 2026/896, https://www.legislation.gov.uk/uksi/2026/896, read 16 November 2026

Frequently asked questions

No obligation

Ask for a call back about solar in Frome.

What type of property is it?

What are you looking for?

Name, postcode and phone are needed. The rest is optional.

We use what you send here to answer you. If you said yes to advert matching in the cookie choices, Google Ads also receives your email address and phone number in scrambled (hashed) form, to match this enquiry to our adverts. See the privacy policy.

Six panels, no battery, from

£6,000

Six panels with a 6kWh battery from £7,800. Fixed in writing after a free survey.

  1. We ring you back to talk through your home and what you want.
  2. A free survey checks your roof, loft and electrics.
  3. Your price is fixed in writing, and you have 14 days to change your mind.

Rather see a figure first? Get your guide price online, or call 01202 161222.