Rated 5.0 on Google

Solar in Burnham-on-Sea

Six panels fully installed from £6,000, or £7,800 with a 6kWh battery. Scaffolding and 0% VAT included, and a free survey fixes your price in writing.

Sam Holton
Layout of the panels are spot on, the team put in graft the last 2 days, big job done properly and smoothly! Excited to see the returns from this install!

Google review, October 2026Solar

Get your guide price

What type of property is it?

What are you looking for?

Rated 5.0on Google
MCScertified, NAP/83770/26/1
Free surveyno obligation
Fixed pricein writing after survey
0% VATends 31 March 2027

Areas we cover

In and around Burnham-on-Sea.

The same published prices apply everywhere in Burnham-on-Sea, and the survey is free. We cover Burnham-on-Sea from our office in Poole.

  • Highbridge
  • Berrow
  • Brean
  • Brent Knoll
  • East Brent
  • Lympsham
  • Mark
  • West Huntspill
  • East Huntspill
  • Edithmead
  • Watchfield
  • Burnham Without

At a glance

What decides a solar job in Burnham-on-Sea.

  • PlanningSomerset Council, with a Burnham-on-Sea conservation area from 1988
  • CoastEnvironment Agency flood warning areas along the Esplanade
  • HomesListed seafront houses from the 19th century under slate, many now flats
  • Grid operatorNGED, South West licence area, checked across 21 postcodes

Guide prices in Burnham-on-Sea

Fully installed with DMEGC 465W all-black panels, a battery-ready hybrid inverter, scaffolding and 0% VAT. The same table applies everywhere we work, and your survey fixes the price in writing.

Guide prices by number of panels and battery option, fully installed with scaffolding and 0% VAT
SystemOutputSolar only+ 6kWh battery+ 12kWh battery
6 panels2.79 kWp£6,000£7,800£9,500
8 panels3.72 kWp£6,400£8,200£9,900
10 panels4.65 kWp£6,800£8,500£10,100
12 panels5.58 kWp£7,200£8,900£10,500

0% VAT on qualifying installations until 31 March 2027, then 5%. What qualifies, or see every price and what can change it.

Call 01202 161222

Every installation

What every price includes

  • DMEGC 465W all-black panels
  • Hybrid inverter, battery-ready from day one
  • Battery where selected, set up for off-peak charging
  • Scaffolding, put up and taken down
  • Bird protection around the panels
  • Monitoring app, set up before we leave
  • Grid connection paperwork and handover pack
  • Help registering for export payments

Batteries and inverters from Fox ESS, Tesla, Sigenergy, Sunsynk and Powervault, named on your written quote. Backup through a power cut, for key circuits or the whole home, is priced at survey.

Two Pro-Fit installers fixing an all-black panel to the mounting rails on a pitched roof
Installed by Pro-Fit

What customers say about Pro-Fit.

Reviews
5.0
See our reviews on Google
  • Keeley ShawGoogle review, October 2026
    Recently had 8 panels installed and Henry & theo were really polite and professional. From start to finish everything was great and no mess was made or left behind. Excellent - ⭐️⭐️⭐️⭐️⭐️
    Solar
  • safia segouiniGoogle review, October 2026
    Would definitely recommend to anyone considering solar. Really happy with the service from Pro Fit. The whole process was smooth from start to finish, and the team were friendly, professional and kept me informed throughout. The solar panels look great and everything was installed neatly and efficiently.
    Solar
  • jakGoogle review, September 2026
    Used them for panels and a battery. Fraser and Theo were professional from start to finish. Would definitely recommend. The design and layout were perfect.
    Solar and battery
  • Elias MugotGoogle review, September 2026
    Really appreciated the team didn’t try to upsell me. Connor was able to help looking at our usage, roof angle and shading and design a good design that actually made sense for us going forward.
    Solar design
  • BenGoogle review, September 2026
    Great work, the team arrived on time and have worked relentlessly to get the panels installed, was a 8 panel install and it looks superb, im pleased as they dont look ugly and actually compliment our new slate roof.
    Solar
  • Max WareGoogle review, September 2026
    Fraser installed 6 panels and the system is now up and running too. We cant wait to see the returns and we are so glad we've taken the step earlier rather than later. Thank you!
    Solar
  • AhmadGoogle review, September 2026
    Aaron has been a pleasure, the office when calling in were also super polite. Will definitely be using for future solar jobs on our other commercial properties.
    Commercial solar

How it works

  1. A guide price, or a call

    Answer five short questions for a guide price on screen, or ring us. We design a system around your roof and how you use electricity.

  2. Free home survey

    A surveyor checks your roof, loft, electrics and access. Your price is then fixed in writing, and you have 14 days to change your mind.

  3. Installation

    Usually one to two days on site, with scaffolding included in the price. We commission the system and notify the grid operator for you.

The local detail

What changes a solar job in Burnham-on-Sea.

We cover Burnham-on-Sea and Highbridge for solar panels and home batteries, from the Esplanade out to Berrow, Brean and Brent Knoll. Prices start from £6,000 for 6 panels, and a free survey fixes yours in writing. On this stretch of coast the questions are salt, wind and tide, the listed seafront and the flats inside it. Our Somerset page covers the rest of the county.

How exposed is a seafront roof in Burnham-on-Sea?

Very. Burnham sits at the mouth of the Parrett on Bridgwater Bay, part of the Bristol Channel, whose 11-metre tidal range is second only to the Bay of Fundy, and the curved sea wall along the Esplanade was finished in 1988 after the storm surge of December 1981 flooded the town1. The Environment Agency still runs flood warning areas for seafront properties from South Esplanade to Berrow, including Pier Street, Abingdon Street, College Street and Regent Street, and for the streets behind them, including the High Street, Victoria Street and Adam Street4.

Three things follow for an install. The rails, clamps and fixings need a corrosion rating that suits salt air, and the mounting is checked for wind loading on an open coast. And the inverter and battery go on a wall, well above the floor, away from any room or garage that took water in a past surge. None of this rules solar out.

What are the Esplanade's older houses built from?

The listed ones are rendered or faced in stone, under slate. Historic England's list entries for Steart House at 44 The Esplanade and for numbers 46 and 47 describe early 19th-century houses, rendered and colourwashed, with a parapet, a slate roof and box dormers. Numbers 52 to 58 are a mid-19th-century Italianate convex terrace of seven houses under slate roofs, now mostly flats3. Burnham grew as a resort from the late 18th century, and a terrace on Berrow Road dates from 1838 to 18411.

The seafront's best-known listed buildings are St Andrew's Church, Grade I, with its leaning tower, and the low lighthouse on legs, built in 1832 and Grade II. Listing takes a building out of permitted development altogether, so panels on any of those Esplanade houses need planning permission and listed building consent. On the roof itself, a parapet hides an array well from the street but also hides the roof from a ladder, so access is planned at the survey, and slate needs its own hooks and flashings.

Is Highbridge any different?

Yes, in age and character. Highbridge grew as a market and industrial town in the later 19th century, around its livestock and cheese market, Highbridge Wharf and the Somerset and Dorset railway works, which closed in 1930; a housing estate now covers much of the old railway land2. Clay was dug here too: Bridgwater Town Council's history of the brick and tile trade has brickyards spreading "from Burnham-on-Sea to Burrowbridge", and Apex Park on the edge of Burnham was made from flooded clay pits5.

The Valuation Office Agency's figures for Somerset include 69,150 terraced houses, 35,800 bungalows and 36,070 flats and maisonettes among 273,360 homes at 31 March 2026 (Valuation Office Agency, "Council Tax: stock of properties, 2026," tables CTSOP3.1 and CTSOP4.1). They are county figures, as Somerset is one council in the tables. A bungalow roof is easy to reach but holds fewer panels, and on a terrace the array stays on your side of each party wall.

Who handles planning, and what about flats?

Somerset Council, since Sedgemoor District Council was abolished in 20231. Burnham-on-Sea has a conservation area designated in 1988, and Lympsham has one from 1987; we found none for Highbridge, Berrow or Brent Knoll in the council's data, and the data notes no appraisal document for Burnham's7. Inside it, panels cannot go on a wall, balcony or roof enclosure, such as a parapet, that fronts a highway. Somerset Council also publishes the former Sedgemoor district's article 4 directions as one document, which we check against your address. Our guide to solar panels in conservation areas explains the options. No National Landscape covers the town: the Mendip Hills begin further north-east.

Flats need two answers. Since 27 August 2026, Part 14 of the planning rules has its own conditions for blocks of flats, and a listed block cannot use them at all (legislation.gov.uk, SI 2026/896). Then there is ownership: on a leasehold flat the roof usually belongs to the freeholder, whose consent is often the harder step. Tell us at the start if you mean one flat or the whole building.

Which grid operator covers Burnham-on-Sea and Highbridge?

National Grid Electricity Distribution (NGED), which used to trade as Western Power Distribution and "powers the Midlands, South West and South Wales" (nationalgrid.co.uk). We checked 21 postcodes from Brean and Berrow through Burnham to Highbridge and Burnham Without against the National Energy System Operator's licence area map, and every one sits inside NGED's South West area, more than 25 kilometres from any other operator.

A typical home system, up to 16A per phase (about 3.68kW), is notified to NGED after installation. A larger system, or a battery that would export beyond that limit, needs NGED's approval before it is connected (NGED, G98 and G99 connection procedures). Pro-Fit submits it, and the paperwork goes in your handover pack.

Sources for this page (13)
  1. Wikipedia, "Burnham-on-Sea," https://en.wikipedia.org/wiki/Burnham-on-Sea, read 16 November 2026
  2. Wikipedia, "Highbridge, Somerset," https://en.wikipedia.org/wiki/Highbridge,_Somerset, read 16 November 2026
  3. Historic England, list entries 1262951, 1251418 and 1251108, as reproduced by British Listed Buildings, https://britishlistedbuildings.co.uk/101251108-52-58-the-esplanade-burnham-on-sea-and-highbridge, read 16 November 2026
  4. Environment Agency, "Somerset coast at Burnham-on-Sea, seafront properties" and neighbouring flood warning areas, https://check-for-flooding.service.gov.uk/target-area/112FWTBUR01, read 16 November 2026
  5. Bridgwater Town Council, "The Brick and Tile Trade," https://bridgwater-tc.gov.uk/history/19th-century/the-brick-and-tile-trade/, read 16 November 2026
  6. Valuation Office Agency, "Council Tax: stock of properties, 2026," tables CTSOP3.1 and CTSOP4.1, https://www.gov.uk/government/statistics/council-tax-stock-of-properties-2026, read 16 November 2026
  7. planning.data.gov.uk, Somerset Council conservation areas and the Mendip Hills National Landscape, https://www.planning.data.gov.uk/entity/?dataset=conservation-area&organisation_entity=10003, read 16 November 2026
  8. Somerset Council, "Article 4 directions," https://www.somerset.gov.uk/planning-buildings-and-land/article-4-directions/, read 16 November 2026
  9. legislation.gov.uk, General Permitted Development Order 2015, Schedule 2, Part 14, https://www.legislation.gov.uk/uksi/2015/596/schedule/2/part/14, read 16 November 2026
  10. legislation.gov.uk, The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2026, SI 2026/896, https://www.legislation.gov.uk/uksi/2026/896, read 16 November 2026
  11. National Grid Electricity Distribution, nationalgrid.co.uk, https://www.nationalgrid.co.uk/, read 16 November 2026
  12. National Grid Electricity Distribution, "G98 connection procedures" and "G99 connection procedures," https://connections.nationalgrid.co.uk/g99-connection-procedures/, read 16 November 2026
  13. National Energy System Operator, "GIS Boundaries for GB DNO Licence Areas," https://www.neso.energy/data-portal/gis-boundaries-gb-dno-license-areas, read 16 November 2026

Frequently asked questions

No obligation

Ask for a call back about solar in Burnham-on-Sea.

What type of property is it?

What are you looking for?

Name, postcode and phone are needed. The rest is optional.

We use what you send here to answer you. If you said yes to advert matching in the cookie choices, Google Ads also receives your email address and phone number in scrambled (hashed) form, to match this enquiry to our adverts. See the privacy policy.

Six panels, no battery, from

£6,000

Six panels with a 6kWh battery from £7,800. Fixed in writing after a free survey.

  1. We ring you back to talk through your home and what you want.
  2. A free survey checks your roof, loft and electrics.
  3. Your price is fixed in writing, and you have 14 days to change your mind.

Rather see a figure first? Get your guide price online, or call 01202 161222.