Rated 5.0 on Google

Solar in Glastonbury

Six panels fully installed from £6,000, or £7,800 with a 6kWh battery. Scaffolding and 0% VAT included, and a free survey fixes your price in writing.

Sam Holton
Layout of the panels are spot on, the team put in graft the last 2 days, big job done properly and smoothly! Excited to see the returns from this install!

Google review, October 2026Solar

Get your guide price

What type of property is it?

What are you looking for?

Rated 5.0on Google
MCScertified, NAP/83770/26/1
Free surveyno obligation
Fixed pricein writing after survey
0% VATends 31 March 2027

Areas we cover

In and around Glastonbury.

The same published prices apply everywhere in Glastonbury, and the survey is free. We cover Glastonbury from our office in Poole.

  • Beckery
  • Northover
  • Edgarley
  • Meare
  • Godney
  • West Pennard
  • Baltonsborough
  • North Wootton
  • Coxley
  • Pilton

At a glance

What decides a solar job in Glastonbury.

  • PlanningSomerset Council, with Glastonbury Town Council at parish level
  • ConservationOver 170 listed buildings, and the Tor since 1992
  • Grid operatorNGED, in its South West England area
  • RoofsSomerset roofs of local clay tile, with slate from Wales and some thatch

Guide prices in Glastonbury

Fully installed with DMEGC 465W all-black panels, a battery-ready hybrid inverter, scaffolding and 0% VAT. The same table applies everywhere we work, and your survey fixes the price in writing.

Guide prices by number of panels and battery option, fully installed with scaffolding and 0% VAT
SystemOutputSolar only+ 6kWh battery+ 12kWh battery
6 panels2.79 kWp£6,000£7,800£9,500
8 panels3.72 kWp£6,400£8,200£9,900
10 panels4.65 kWp£6,800£8,500£10,100
12 panels5.58 kWp£7,200£8,900£10,500

0% VAT on qualifying installations until 31 March 2027, then 5%. What qualifies, or see every price and what can change it.

Call 01202 161222

Every installation

What every price includes

  • DMEGC 465W all-black panels
  • Hybrid inverter, battery-ready from day one
  • Battery where selected, set up for off-peak charging
  • Scaffolding, put up and taken down
  • Bird protection around the panels
  • Monitoring app, set up before we leave
  • Grid connection paperwork and handover pack
  • Help registering for export payments

Batteries and inverters from Fox ESS, Tesla, Sigenergy, Sunsynk and Powervault, named on your written quote. Backup through a power cut, for key circuits or the whole home, is priced at survey.

Two Pro-Fit installers fixing an all-black panel to the mounting rails on a pitched roof
Installed by Pro-Fit

What customers say about Pro-Fit.

Reviews
5.0
See our reviews on Google
  • Keeley ShawGoogle review, October 2026
    Recently had 8 panels installed and Henry & theo were really polite and professional. From start to finish everything was great and no mess was made or left behind. Excellent - ⭐️⭐️⭐️⭐️⭐️
    Solar
  • safia segouiniGoogle review, October 2026
    Would definitely recommend to anyone considering solar. Really happy with the service from Pro Fit. The whole process was smooth from start to finish, and the team were friendly, professional and kept me informed throughout. The solar panels look great and everything was installed neatly and efficiently.
    Solar
  • jakGoogle review, September 2026
    Used them for panels and a battery. Fraser and Theo were professional from start to finish. Would definitely recommend. The design and layout were perfect.
    Solar and battery
  • Elias MugotGoogle review, September 2026
    Really appreciated the team didn’t try to upsell me. Connor was able to help looking at our usage, roof angle and shading and design a good design that actually made sense for us going forward.
    Solar design
  • BenGoogle review, September 2026
    Great work, the team arrived on time and have worked relentlessly to get the panels installed, was a 8 panel install and it looks superb, im pleased as they dont look ugly and actually compliment our new slate roof.
    Solar
  • Max WareGoogle review, September 2026
    Fraser installed 6 panels and the system is now up and running too. We cant wait to see the returns and we are so glad we've taken the step earlier rather than later. Thank you!
    Solar
  • AhmadGoogle review, September 2026
    Aaron has been a pleasure, the office when calling in were also super polite. Will definitely be using for future solar jobs on our other commercial properties.
    Commercial solar

How it works

  1. A guide price, or a call

    Answer five short questions for a guide price on screen, or ring us. We design a system around your roof and how you use electricity.

  2. Free home survey

    A surveyor checks your roof, loft, electrics and access. Your price is then fixed in writing, and you have 14 days to change your mind.

  3. Installation

    Usually one to two days on site, with scaffolding included in the price. We commission the system and notify the grid operator for you.

The local detail

What changes a solar job in Glastonbury.

We install solar panels and batteries across Glastonbury, from Beckery and Northover to Edgarley, and in Meare, West Pennard and Baltonsborough. Guide prices start from £6,000 for 6 panels, and the free survey fixes yours in writing. Here the first question is usually planning, because the conservation area takes in the Abbey, the High Street and, since 1992, the Tor itself. Our Somerset page covers the wider county.

How much of Glastonbury is a conservation area?

A large part of the town. Mendip District Council designated it in 1976 to cover the Abbey site, the High Street and the streets around the Abbey, then added the Tor and the land around it in 1992. Its 2010 appraisal counts over 170 listed buildings or structures inside, including St John's Church on the High Street, Grade I, and St Benedict's Church, Grade II*1. The Tor, topped by the roofless tower of St Michael's Church, is a scheduled monument managed by the National Trust3.

Somerset Council is the planning authority, with Glastonbury Town Council below it at parish level2. A listed house needs planning permission and listed building consent for solar. Inside a conservation area the limit is narrower: nothing on a wall, balcony or roof enclosure facing a highway, and a prior approval application for any flat roof (legislation.gov.uk, SI 2026/896). No National Landscape covers the town (planning.data.gov.uk, "Area of outstanding natural beauty").

One local point to check. The 2010 appraisal recommended an article 4 direction covering every unlisted house in the conservation area, which would bring changes to roof slopes facing a road under planning control. We could not confirm whether one was made, so for an address inside the boundary we check with Somerset Council before we quote. Our guide to solar panels in conservation areas explains article 4 directions.

What are Glastonbury's houses and roofs made of?

A mix. The appraisal describes Doulting stone and the local blue lias on the grander buildings, lime-rendered rubble stone on cottages, and, from the 18th century, many red brick cottages and houses as brick became cheaper and more fashionable. Doulting stone, quarried on the Mendips, was used to build the Abbey too4.

Historic Glastonbury is mainly roofed in locally made clay tiles of slightly different shapes, which overlap into what the appraisal calls distinctive "Somerset" roofs. Slate came in from Wales from the 19th century, and a few thatched roofs survive. Because those tiles vary from house to house, a matching replacement is not always a stock item, so we check what is on your roof, and whether spares exist, before we quote. A thatched cottage needs a different plan, usually a garage or outbuilding roof.

Away from the centre, many homes are newer. Across Somerset, the Valuation Office Agency counts 14,320 homes built between 1945 and 1954 and 20,470 between 1955 and 1964, at 31 March 2026 (Valuation Office Agency, "Council Tax: stock of properties, 2026," table CTSOP4.1). Post-war semis and terraces usually have simple pitched roofs, though a roof of that age needs its condition checked: one with ten years or less left should be dealt with before panels go on.

Does Glastonbury flood, and does that change where the battery goes?

Rarely in the town itself, which stands at a dry point on the low-lying Somerset Levels2. The 2010 appraisal records the last particularly serious flood in 1606, when the water was over two metres deep by a marker in St Benedict's Church, and says later flood works have all but removed the threat. The Environment Agency data on planning.data.gov.uk agrees for the centre: the Market Place sits outside the mapped zones, while some low ground on the western side of town, towards Beckery, is in flood zone 2 (planning.data.gov.uk, "Flood risk zone").

On the slopes towards the Tor and Edgarley, flood risk seldom shapes the job. Around Beckery and on the moor edges towards Meare, we check your plot on the flood map and think twice about a ground mount.

Which grid operator covers Glastonbury, and what does the application involve?

National Grid Electricity Distribution (NGED), which says it "powers the Midlands, South West and South Wales" (nationalgrid.co.uk). On the National Energy System Operator's licence area map, every Glastonbury postcode we tested, across BA6 8 and BA6 9, falls inside NGED's South West England area, around eight kilometres or more from where SSEN's begins7.

The application is ours to make, not yours. If your system is a typical home size, NGED is notified once it is installed. If it is larger, or a battery would lift your export above the limit, NGED has to approve it before it is connected. Either way, the forms go in your handover pack. Already have panels? Our battery retrofit page covers adding storage.

Which villages around Glastonbury do you cover?

All of them: Meare and Godney on the moors, West Pennard and Baltonsborough to the east, and North Wootton and Coxley towards Wells. The Glastonbury Festival takes its name from the town but is held at Pilton2, which we cover too. Beckery, once a village in its own right, is now a suburb, and Northover is where sheepskin and slipper making grew alongside Clarks.

Street is less than a mile away across the River Brue, with its own conservation area and appraisal. Our Street page covers it.

Sources for this page (10)
  1. Mendip District Council, "Conservation Area Appraisal: Glastonbury" (July 2010), linked from planning.data.gov.uk, https://www.planning.data.gov.uk/entity/44003956, read 16 November 2026
  2. Wikipedia, "Glastonbury," https://en.wikipedia.org/wiki/Glastonbury, read 16 November 2026
  3. Wikipedia, "Glastonbury Tor," https://en.wikipedia.org/wiki/Glastonbury_Tor, read 16 November 2026
  4. Wikipedia, "Doulting Stone Quarry," https://en.wikipedia.org/wiki/Doulting_Stone_Quarry, read 16 November 2026
  5. Valuation Office Agency, "Council Tax: stock of properties, 2026," table CTSOP4.1, Somerset, at 31 March 2026, https://www.gov.uk/government/statistics/council-tax-stock-of-properties-2026, read 16 November 2026
  6. National Grid Electricity Distribution, nationalgrid.co.uk, https://www.nationalgrid.co.uk/, read 16 November 2026
  7. National Energy System Operator, "GIS Boundaries for GB DNO Licence Areas" (licence areas dated 3 May 2024), https://www.neso.energy/data-portal/gis-boundaries-gb-dno-license-areas, read 16 November 2026
  8. planning.data.gov.uk, "Flood risk zone," https://www.planning.data.gov.uk/dataset/flood-risk-zone, read 16 November 2026
  9. planning.data.gov.uk, "Area of outstanding natural beauty," https://www.planning.data.gov.uk/dataset/area-of-outstanding-natural-beauty, read 16 November 2026
  10. legislation.gov.uk, The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2026, SI 2026/896, https://www.legislation.gov.uk/uksi/2026/896, read 16 November 2026

Frequently asked questions

No obligation

Ask for a call back about solar in Glastonbury.

What type of property is it?

What are you looking for?

Name, postcode and phone are needed. The rest is optional.

We use what you send here to answer you. If you said yes to advert matching in the cookie choices, Google Ads also receives your email address and phone number in scrambled (hashed) form, to match this enquiry to our adverts. See the privacy policy.

Six panels, no battery, from

£6,000

Six panels with a 6kWh battery from £7,800. Fixed in writing after a free survey.

  1. We ring you back to talk through your home and what you want.
  2. A free survey checks your roof, loft and electrics.
  3. Your price is fixed in writing, and you have 14 days to change your mind.

Rather see a figure first? Get your guide price online, or call 01202 161222.